Fig 4 Lifetime risks of water treatment with control monitoring

Fig 4 Lifetime risks of water treatment with control monitoring

May 9th, 2016

Comparing lifetime risks of water treatment processes using ORE (© Riskope) results from a preliminary analysis of Lime vs. ChemS processes at short, medium and long term. The vertical axe represents the total risk. Each column is split in the risks generated within a macro-element.

Category:

Leave a Reply

Your email address will not be published. Required fields are marked *

Riskope Blog latests posts

  • New achievements in risk assessment and management
  • 2-05-2023
  • New achievements in risk assessment and management will be attained thanks to SRK Consulting merging with Riskope. Indeed, we are…
  • Read More
  • Open letter to the organizer of the tailings dam round robin exercise
  • 29-03-2023
  • Dear Ryan, please receive this open letter to the organizer of the tailings dam round robin exercise. It explains our…
  • Read More
  • Landslides risk assessment and monitoring
  • 8-03-2023
  • During the first couple decades of our professional life we worked extensively with Landslides risk assessment and monitoring in the…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.