Coal transportation reliability study

Project NameCoal transportation logistics risk assessment study
ClientConfidential
IndustryCoal Mining
Project ObjectiveUnderstand the details of consequences in the aftermath of an earthquake to the transportation network and the main ship-loading wharf. Possible mitigative measures and corrective options.
Project ScopeThe client needed “hard numbers” to quantify a spectrum of quantitative damages and then discuss with his insurance broker.
Resultllowing transparent risk and opportunity discussions, the client could leverage his knowledge and negotiate his premium.
Files / Attachment

48_big

Client Comments

Riskope Blog latests posts

  • Strategic operational and tactical planning for tailings hydro dams
  • 16-09-2020
  • We are learning that structural integrity of hydro dams is also becoming an issue. Thus, similarly to tailings dams, we…
  • Read More
  • Dam risks informational gap
  • 9-09-2020
  • Dam risks informational gap impacts to a certain extent all dams: hydro, tailings and finally, toxic dumps. There are thousands…
  • Read More
  • Comparison of ORE2_Tailings estimated dam failure probabilities
  • 2-09-2020
  • The comparison of ORE2_Tailings estimated dam failure probabilities is an important element of Riskope continued commitment to test the validity…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.