Energy and fresh water supply in a radius of 200km from an operation.

Project NameRisk assessment for energy and water supply
ClientCodelco (Chile)
IndustryMining
Project ObjectiveEnsure uninterrupted, reliable energy and fresh water supply to Chuquicamata Mining Operations.
Project ScopeDevelop an holistic risk assessment for hundreds of kilometres of water pipelines, wells pumping stations, high voltage lines and electric substations.
ResultHelped by Riskope the client gained a clear vision of the most critical issues and could develop a long term mitigation plan, balancing safety and cost efficacy.
Files / Attachment

221_2 Type of accidents along the road

Client Comments

Riskope Blog latests posts

  • Lessons learned in twenty years of hazard, risk and resilience analyses
  • 21-07-2021
  • Writing lessons learned in twenty years of hazard, risk and resilience analyses has been a difficult exercise for various reasons.…
  • Read More
  • Sustainability, ethics and risks
  • 14-07-2021
  • Sustainability, ethics and risks results from a discussion we read on LinkedIN. The discussion arose after our friendĀ Giuseppe di Capua…
  • Read More
  • Tailings dam mitigation risk informed decision making
  • 7-07-2021
  • Tailings dam mitigation risk informed decision making closes the discussion we presented in prior blogposts. We now focus on one…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.