Energy and fresh water supply in a radius of 200km from an operation.

Project NameRisk assessment for energy and water supply
ClientCodelco (Chile)
IndustryMining
Project ObjectiveEnsure uninterrupted, reliable energy and fresh water supply to Chuquicamata Mining Operations.
Project ScopeDevelop an holistic risk assessment for hundreds of kilometres of water pipelines, wells pumping stations, high voltage lines and electric substations.
ResultHelped by Riskope the client gained a clear vision of the most critical issues and could develop a long term mitigation plan, balancing safety and cost efficacy.
Files / Attachment

221_2 Type of accidents along the road

Client Comments

Riskope Blog latests posts

  • Limitations, disclaimers and risks
  • 12-08-2020
  • Today we present a story about Limitations, disclaimers and risks. The case related to limitations, disclaimers and risks. This is…
  • Read More
  • Dam Monitoring Effects
  • 5-08-2020
  • Dam monitoring effect is a case history. A client acquired a mining properties portfolio. It included inactive dams at closed…
  • Read More
  • Tailings dams design and experience
  • 29-07-2020
  • Lately several tailings dam failures rocked the mining world. Despite the relative high frequency of these events we have heard…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.