Energy and fresh water supply in a radius of 200km from an operation.

Project NameRisk assessment for energy and water supply
ClientCodelco (Chile)
IndustryMining
Project ObjectiveEnsure uninterrupted, reliable energy and fresh water supply to Chuquicamata Mining Operations.
Project ScopeDevelop an holistic risk assessment for hundreds of kilometres of water pipelines, wells pumping stations, high voltage lines and electric substations.
ResultHelped by Riskope the client gained a clear vision of the most critical issues and could develop a long term mitigation plan, balancing safety and cost efficacy.
Files / Attachment

221_2 Type of accidents along the road

Client Comments

Riskope Blog latests posts

  • ORE2 tailings conclusions
  • 20-10-2021
  • This series of eight blogposts is a summary of what a standard ORE2_Tailings™ quantitative risk assessment deployment report includes. Indeed,…
  • Read More
  • ORE2 tailings tactical and strategic
  • 13-10-2021
  • As stated earlier ORE2_Tailings™ allows to define in a clear, transparent, and reproducible way which risks are tolerable or intolerable.…
  • Read More
  • ORE2 tailings RIDM
  • 6-10-2021
  • We split this Chapter in two sections: section 10.1 discusses what actions one can take to enhance the knowledge base.…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.