Energy and fresh water supply in a radius of 200km from an operation.

Project NameRisk assessment for energy and water supply
ClientCodelco (Chile)
IndustryMining
Project ObjectiveEnsure uninterrupted, reliable energy and fresh water supply to Chuquicamata Mining Operations.
Project ScopeDevelop an holistic risk assessment for hundreds of kilometres of water pipelines, wells pumping stations, high voltage lines and electric substations.
ResultHelped by Riskope the client gained a clear vision of the most critical issues and could develop a long term mitigation plan, balancing safety and cost efficacy.
Files / Attachment

221_2 Type of accidents along the road

Client Comments

Riskope Blog latests posts

  • Convergent risk assessments
  • 20-01-2021
  • Convergent risk assessments integrate areas that are significant to an organization, such as operational risk generated by various hazards or…
  • Read More
  • Business as usual definition in Risk Assessment
  • 13-01-2021
  • Business as usual definition in risk assessment, as defined in our day-to-day practice, is an unchanging state of affairs. That…
  • Read More
  • Foreseeability and predictability in risk assessments
  • 6-01-2021
  • The discussion of terms such as Foreseeability and predictability in risk assessments is rather common. Like usual, at Riskope we…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.