Energy and fresh water supply in a radius of 200km from an operation.

Project NameRisk assessment for energy and water supply
ClientCodelco (Chile)
IndustryMining
Project ObjectiveEnsure uninterrupted, reliable energy and fresh water supply to Chuquicamata Mining Operations.
Project ScopeDevelop an holistic risk assessment for hundreds of kilometres of water pipelines, wells pumping stations, high voltage lines and electric substations.
ResultHelped by Riskope the client gained a clear vision of the most critical issues and could develop a long term mitigation plan, balancing safety and cost efficacy.
Files / Attachment

221_2 Type of accidents along the road

Client Comments

Riskope Blog latests posts

  • TCFD and TNFD for mining
  • 25-05-2022
  • TCFD and TNFD for mining: concepts, examples and caveats, is the paper we presented at #CIMBC22 Mineral Economics and Finance.…
  • Read More
  • Impact of climate change change projections on tailings dams survivability
  • 18-05-2022
  • Impact of climate change projections on tailings dams survivability is the paper we presented at #CIMBC22 Climate Change and Tailings…
  • Read More
  • FUV vs RIDM friends or foes at CIMBC22
  • 11-05-2022
  • FUV vs RIDM friends or foes at CIMBC22 sounds like a riddle, right? But it is not! Please, note FUV…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.