Energy and fresh water supply in a radius of 200km from an operation.

Project NameRisk assessment for energy and water supply
ClientCodelco (Chile)
IndustryMining
Project ObjectiveEnsure uninterrupted, reliable energy and fresh water supply to Chuquicamata Mining Operations.
Project ScopeDevelop an holistic risk assessment for hundreds of kilometres of water pipelines, wells pumping stations, high voltage lines and electric substations.
ResultHelped by Riskope the client gained a clear vision of the most critical issues and could develop a long term mitigation plan, balancing safety and cost efficacy.
Files / Attachment

221_2 Type of accidents along the road

Client Comments

Riskope Blog latests posts

  • Quantitative Convergent ERM to Solve Real Life Problem
  • 28-10-2020
  • Riskope presented at Infonex (https://infonex.com/ ) Quantitative Convergent ERM to Solve Real Life Problem. The conference was carried out on…
  • Read More
  • Tailings dams knowledge base creation
  • 21-10-2020
  • Tailings dams knowledge base creation is about how to acquire the information needed to perform well documented risk assessments. Of…
  • Read More
  • SLM and the Probability of failure of a tailings dam
  • 14-10-2020
  • SLM and the probability of failure of a tailings dam goes back 35 years.  A paper entitled “Probability and Risk…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.