Energy and fresh water supply in a radius of 200km from an operation.

Project NameRisk assessment for energy and water supply
ClientCodelco (Chile)
IndustryMining
Project ObjectiveEnsure uninterrupted, reliable energy and fresh water supply to Chuquicamata Mining Operations.
Project ScopeDevelop an holistic risk assessment for hundreds of kilometres of water pipelines, wells pumping stations, high voltage lines and electric substations.
ResultHelped by Riskope the client gained a clear vision of the most critical issues and could develop a long term mitigation plan, balancing safety and cost efficacy.
Files / Attachment

221_2 Type of accidents along the road

Client Comments

Riskope Blog latests posts

  • Landslides risk assessment and monitoring
  • 8-03-2023
  • During the first couple decades of our professional life we worked extensively with Landslides risk assessment and monitoring in the…
  • Read More
  • Societal risk acceptability in the Canadian House of Commons
  • 1-03-2023
  • We are very pleased to see the notion of societal risk acceptability in the Canadian House of Commons, emerge publicly…
  • Read More
  • Multi dimensional Consequences
  • 22-02-2023
  • Multi dimensional Consequences approaches take into consideration the varied losses that a failure can generate. Thus they allow for a…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.