Archives

Balangero Asbestos Mine Environmental Rehabilitation: a Case for CDA-ESM

Mine Environmental Rehabilitation The Balangero Asbestos Mine Environmental Rehabilitation open pit mine, located 35km N-W of Torino (Torino), was the largest operation of this kind in Western Europe. The open pit was cut into the ridge of an elongated hill. The mill was located on one side of the hill and the dumps on the other. Dry tailings were lifted by a conveyor belt from the mill, located at the foot of the hill to a location near the ridge. From…

Read More

Archive

Hosted and powered by WR London.