echo $post_date ?>
ORE2_Tailings case history looks at a real tailings dam. It shows how to interpret ORE2_Tailings probabilities ranges predictions, benchmarks and other useful indications. Description of the real-life active tailings dam case history The case history is a 72.5m high dam with a modified centerline cross section. Construction has stopped, meaning there is no active deposition at this time. Therefore the dam is inactive. The dam stores tailings and a supernatant pond. It has a weir in fair state of…
Read More
echo $post_date ?>
In a world that used to be data-starved, is data indigestion a risk? Data starvation It is rare that we review a project where the monitoring system really works. Instruments fail, are destroyed by neighboring construction, by contractors and animals. Winter conditions, soft soils and tailings or other factors forbid access, timely replacement or maintenance. And then, piezometer do not measure the levels they should because of some geotechnical oddity or construction problem, inclinometers are too short, etc. In some…
Read More
echo $post_date ?>
Information systems and risk management discusses the necessity to create a structured and holistic view on all corporate information. Therefore we look at and how the holistic view should relate to upside and downside risks. Information systems are the set of analytical applications geared toward preparing corporate or project system’s data for business analyses and support to risk informed decision making. Downside risk is the product of the probability of occurrence of a hazard by the cost of the undesirable…
Read More