Archives

Evacuating Grenville-sur-la-Rouge is a good decision but maybe not the right one

Evacuating Grenville-sur-la-Rouge is a good decision but maybe not the right one. Indeed, when performing Risk Informed Decision Making (RIDM) a distinction must be made between right decisions and good decisions. A bit of background of on Bell Falls Hydro Dam Reportedly, the officials stated that: “we’re running about 940 cubic metres per second, and they predict it could go up as much as 1300 cubic metres per second. The dam was designed for a maximum one-thousand-year flood of 960…

Read More

Archive

Hosted and powered by WR London.