A Step by Step Guide to Risk Informed Decision Making for Mining Projects and Operations

A Step by Step Guide to Risk Informed Decision Making for Mining Projects and Operations

Nov 5th, 2017

Date/Time
Date(s) - 05/11/2017
All Day

Location
FAIRMONT BANFF SPRINGS

Categories


Tailings and Mine Waste 2017

A step by step guide to Risk Informed Decision Making for mining projects and operations course at TMW2017

November 5th-8th 2017 Banff Springs Hotel,
Banff, Alberta, Canada

By Franco Oboni, Cesar Oboni, Oboni Riskope Associates Inc., Vancouver, B.C.

Riskope will be present and active with two papers and a short course.

Short course: A step by step guide to Risk Informed Decision Making for mining projects and operations.

A step by step guide to Risk Informed Decision Making for mining projects and operations will be a hands-on exercise. We will use the Balangero Asbestos Mine Dumps Environmental Rehabilitation as a basis. That project, a competitive bid, was won by an engineering group supported by what was then called Risk Based Decision Making (RBDM). Thus it was demonstrated that including risk assessment through the design of a project, from cradle to delivery and including risk driven maintenance concepts brought value and a leading edge to the proponents.

A Step by Step Guide to Risk Informed Decision Making for Mining Projects and Operations

Together we will work through all the phases of the approach (based on the ORE methodology -Optimum Risk Estimates- ©Oboni Riskope Associates Inc.), including:

· System definition
· Success/failure criteria. Objectives Hierarchy, constrained objectives.
· Alternatives generation
· Delivered data
· Needed data. Data to be acquired/evaluated
· What methods to use for probabilistic estimates?
· Hazards and multi-dimensional consequences analyses
· Risks
· Risk tolerances
· Dashboards
· Recommendations and Condition of validity.
· Decision-making (alternative selection, mitigation, resilience enhancements, etc.)
· Actions (includes communication)
· Back to the start: monitoring, new data, etc.

Schedule and ToC follow the approach above:

09:00-10:30
· Introductions
· System definition
· Success/failure criteria. Objectives Hierarchy, constrained objectives.
· Alternatives generation
Coffee

11:12:30
· Delivered data
· Needed data. Data to be acquired/evaluated
· What methods to use for probabilistic estimates?

Lunch
13:30-15:00
· Hazards and multi-dimensional consequences analyses
· Risks
· Risk tolerances
· Dashboards
· Recommendations and Condition of validity.
Coffee

15:30-17:00
· Decision-making (alternative selection, mitigation, resilience enhancements, etc.)
· Actions (includes communication)
· Back to the start: monitoring, new data, etc.

Category: Risk Analysis, Risk Management

Comments are closed.

Riskope Blog latests posts

  • New achievements in risk assessment and management
  • 2-05-2023
  • New achievements in risk assessment and management will be attained thanks to SRK Consulting merging with Riskope. Indeed, we are…
  • Read More
  • Open letter to the organizer of the tailings dam round robin exercise
  • 29-03-2023
  • Dear Ryan, please receive this open letter to the organizer of the tailings dam round robin exercise. It explains our…
  • Read More
  • Landslides risk assessment and monitoring
  • 8-03-2023
  • During the first couple decades of our professional life we worked extensively with Landslides risk assessment and monitoring in the…
  • Read More
  • Get in Touch
  • Learn more about our services by contacting us today
  • t +1 604-341-4485
  • +39 347-700-7420

Hosted and powered by WR London.